Projects – MTV https://mtvent.com.au Mine & Tunnel Ventilation Thu, 29 Apr 2021 04:41:11 +0000 en-AU hourly 1 https://wordpress.org/?v=5.6.4 https://mtvent.com.au/wp-content/uploads/2020/06/cropped-MTV-icon-32x32.png Projects – MTV https://mtvent.com.au 32 32 MMG: Dugald River https://mtvent.com.au/projects/mmg-dugald-river/?utm_source=rss&utm_medium=rss&utm_campaign=mmg-dugald-river Tue, 09 Jun 2020 22:31:25 +0000 http://mtvent.com.au/?post_type=projects&p=437 6x AL16-1100 Korfmann Vertical Fan with 1000V 110kW Mine Spec Motor

The post MMG: Dugald River appeared first on MTV.

]]>
6x AL16-1100 Korfmann Vertical Fan with 1000V 110kW Mine Spec Motor

Scope of Works: Electrical Installation Equipment, Mechanical Installation Equipment, Monitoring Equipment and Commissioning & Testing

The post MMG: Dugald River appeared first on MTV.

]]>
West African Resources – Sanbrado Gold Project https://mtvent.com.au/projects/west-african-resources-sanbrado-gold-project/?utm_source=rss&utm_medium=rss&utm_campaign=west-african-resources-sanbrado-gold-project Sun, 07 Jun 2020 11:44:04 +0000 http://mtvent.com.au/?post_type=projects&p=417 3 Korfmann Single Stage AL18-4500 Fan with a 450kW, 4P, 415V WEG or
TECO Mine spec motor

The post West African Resources – Sanbrado Gold Project appeared first on MTV.

]]>
3 Korfmann Single Stage AL18-4500 Fan with a 450kW, 4P, 415V WEG or TECO Mine spec motor

Scope of Works: Mechanical Equipment Supply, Monitoring Equipment Supply and Testing

The post West African Resources – Sanbrado Gold Project appeared first on MTV.

]]>
Ghana: Newmont Ghana Gold https://mtvent.com.au/projects/ghana-newmont-ghana-gold/?utm_source=rss&utm_medium=rss&utm_campaign=ghana-newmont-ghana-gold Sun, 07 Jun 2020 11:41:17 +0000 http://mtvent.com.au/?post_type=projects&p=416 1x AL25-6300 1000V Vertical Fan

The post Ghana: Newmont Ghana Gold appeared first on MTV.

]]>
1x AL25-6300 1000V Vertical Fan

Scope of Works: Electrical Installation Equipment, Mechanical Installation Equipment, Monitoring Equipment and Commissioning & Testing

The post Ghana: Newmont Ghana Gold appeared first on MTV.

]]>
Egypt: Pharaoh Gold Mines https://mtvent.com.au/projects/egypt-pharaoh-gold-mines/?utm_source=rss&utm_medium=rss&utm_campaign=egypt-pharaoh-gold-mines Sun, 07 Jun 2020 10:20:10 +0000 http://mtvent.com.au/?post_type=projects&p=404 1x AL28 Korfmann Vertical Fan with 1000V 500kW Mine Spec Motor;
1kV 560kW VSD Starter Container

The post Egypt: Pharaoh Gold Mines appeared first on MTV.

]]>
1x AL28 Korfmann Vertical Fan with 1000V 500kW Mine Spec Motor; 1kV 560kW VSD Starter Container

Scope of Works: Electrical Installation Equipment, Mechanical Installation Equipment, Monitoring Equipment and Commissioning & Testing

The post Egypt: Pharaoh Gold Mines appeared first on MTV.

]]>
Mincor Mariners https://mtvent.com.au/projects/mincor-mariners/?utm_source=rss&utm_medium=rss&utm_campaign=mincor-mariners Mon, 01 Jun 2020 04:54:29 +0000 http://mtvent.com.au/?post_type=projects&p=348 A unique configuration of four MTV 1400-132kw fans in parallel, with three always in operation and one available for safety and maintenance purposes. Modular manufacturing technique allowed for easy transport and rapid installation at depth of 500m.

The post Mincor Mariners appeared first on MTV.

]]>
A unique configuration of four MTV 1400-132kw fans in parallel, with three always in operation and one available for safety and maintenance purposes. Modular manufacturing technique allowed for easy transport and rapid installation at depth of 500m.

The post Mincor Mariners appeared first on MTV.

]]>
Stawell Gold https://mtvent.com.au/projects/stawell-gold/?utm_source=rss&utm_medium=rss&utm_campaign=stawell-gold Mon, 01 Jun 2020 04:42:53 +0000 http://mtvent.com.au/?post_type=projects&p=347 Approached with a request to modify their existing ventilation system to increase pressure across the mine, MTV devised a cost-effective solution where two Korfmann AL22-2500 fans were added to the existing parallel fans to create twin fans in series.

The post Stawell Gold appeared first on MTV.

]]>
Approached with a request to modify their existing ventilation system to increase pressure across the mine, MTV devised a cost-effective solution where two Korfmann AL22-2500 fans were added to the existing parallel fans to create twin fans in series.

The post Stawell Gold appeared first on MTV.

]]>
Sandfire Resources – De Grussa https://mtvent.com.au/projects/sandfire-resources-de-grussa-mine-site/?utm_source=rss&utm_medium=rss&utm_campaign=sandfire-resources-de-grussa-mine-site Mon, 01 Jun 2020 04:32:46 +0000 http://mtvent.com.au/?post_type=projects&p=345 1x AL28-5000 415V 500kw Vertical Fan; 1x Twin AL28-5000 415V 500kw

The post Sandfire Resources – De Grussa appeared first on MTV.

]]>
1x AL28-5000 415V 500kw Vertical Fan; 1x Twin AL28-5000 415V 500kw

Scope of Works: Electrical Installation Equipment, Mechanical Installation Equipment, Monitoring Equipment and Commissioning & Testing.

Turnkey project involving civils, 11kV/415V Substation, Switch room with VSD drives, PLC, etc, and complete site installation and commissioning. This installation is unique as it has been designed and prepared for two more fans to be fitted in the future, in series with the existing. Substation, Civils and steelwork has been designed for easy change over.

The post Sandfire Resources – De Grussa appeared first on MTV.

]]>
Thiess John Holland – Airport Link https://mtvent.com.au/projects/thiess-john-holland-airport-link/?utm_source=rss&utm_medium=rss&utm_campaign=thiess-john-holland-airport-link Mon, 01 Jun 2020 04:18:57 +0000 http://mtvent.com.au/?post_type=projects&p=342 Primarily underground 6.7 kilometre road connecting Brisbane CBD with the airport.

The post Thiess John Holland – Airport Link appeared first on MTV.

]]>
Primarily underground 6.7 kilometre road connecting Brisbane CBD with the airport. MTV specified, supplied, installed and maintained:

  • 7 x 110kw Korfmann AL 16-1100 Variable Speed Drive fans, horizontally mounted
  • 9 x 40m3 CFT Dust Collectors

The post Thiess John Holland – Airport Link appeared first on MTV.

]]>
AngloGold Ashanti – Sunrise Dam https://mtvent.com.au/projects/anglogold-ashanti-sunrise-dam/?utm_source=rss&utm_medium=rss&utm_campaign=anglogold-ashanti-sunrise-dam Mon, 01 Jun 2020 04:13:56 +0000 http://mtvent.com.au/?post_type=projects&p=340 2 x 3.7m diameter, 2.2MW/ea Primary Centrifugal Fans Each Fan is fitted with 2,200 KW Motors (4,400 KW of combined power); to suit their exact requirements for current and future duties. The fans’ joint capacity will provide the volume of air of 600m3/s @ 6,000Pa in pressure. Scope of works:  The overall installation stands just under 14m in height with […]

The post AngloGold Ashanti – Sunrise Dam appeared first on MTV.

]]>
2 x 3.7m diameter, 2.2MW/ea Primary Centrifugal Fans

Each Fan is fitted with 2,200 KW Motors (4,400 KW of combined power); to suit their exact requirements for current and future duties. The fans’ joint capacity will provide the volume of air of 600m3/s @ 6,000Pa in pressure.

AngloGold Ashanti Sunrise Dam Mine Ventilation

Scope of works:  The overall installation stands just under 14m in height with the vertical discharge and is approximately 35m in length. The Centrifugal Impellers fitted into each fan are just under 7 Tonnes in weight. The Control rooms together are just under 24m in length.  2 x Toshiba 11KV – 6.6KV variable speed drive were selected for this project.

The post AngloGold Ashanti – Sunrise Dam appeared first on MTV.

]]>
La Mancha Resources – Frog’s Leg https://mtvent.com.au/projects/la-mancha-resources-frogs-leg-gold-mine/?utm_source=rss&utm_medium=rss&utm_campaign=la-mancha-resources-frogs-leg-gold-mine Mon, 01 Jun 2020 04:09:51 +0000 http://mtvent.com.au/?post_type=projects&p=338 1 x Korfmann AL28-5500 – 550kw Horizontal Primary Fan with 1000V Soft Starter

The post La Mancha Resources – Frog’s Leg appeared first on MTV.

]]>
1 x Korfmann AL28-5500 – 550kw Horizontal Primary Fan with 1000V Soft Starter

The post La Mancha Resources – Frog’s Leg appeared first on MTV.

]]>