Tunnel Ventilation – MTV https://mtvent.com.au Mine & Tunnel Ventilation Thu, 11 Mar 2021 03:47:09 +0000 en-AU hourly 1 https://wordpress.org/?v=5.6.4 https://mtvent.com.au/wp-content/uploads/2020/06/cropped-MTV-icon-32x32.png Tunnel Ventilation – MTV https://mtvent.com.au 32 32 Thiess John Holland – Airport Link https://mtvent.com.au/projects/thiess-john-holland-airport-link/?utm_source=rss&utm_medium=rss&utm_campaign=thiess-john-holland-airport-link Mon, 01 Jun 2020 04:18:57 +0000 http://mtvent.com.au/?post_type=projects&p=342 Primarily underground 6.7 kilometre road connecting Brisbane CBD with the airport.

The post Thiess John Holland – Airport Link appeared first on MTV.

]]>
Primarily underground 6.7 kilometre road connecting Brisbane CBD with the airport. MTV specified, supplied, installed and maintained:

  • 7 x 110kw Korfmann AL 16-1100 Variable Speed Drive fans, horizontally mounted
  • 9 x 40m3 CFT Dust Collectors

The post Thiess John Holland – Airport Link appeared first on MTV.

]]>
Clem7 Brisbane (North South Bypass Tunnel) https://mtvent.com.au/projects/clem7-brisbane-north-south-bypass-tunnel/?utm_source=rss&utm_medium=rss&utm_campaign=clem7-brisbane-north-south-bypass-tunnel Mon, 01 Jun 2020 03:46:42 +0000 http://mtvent.com.au/?post_type=projects&p=319 MTV was contracted to provide ventilation and dust extraction for the roadheader development of the two-lane 4.8 kilometre tunnels.

The post Clem7 Brisbane (North South Bypass Tunnel) appeared first on MTV.

]]>
MTV was contracted to provide ventilation and dust extraction for the roadheader development of the two-lane 4.8 kilometre tunnels.

  • 6 x 250kw Korfmann AL 17-2500
  • 9 x 40m3 CFT Dust Collectors
  • Flexible Ducting
  • Steel Ventilation Ducting
  • Semi rigid ducting – polyethylene

The post Clem7 Brisbane (North South Bypass Tunnel) appeared first on MTV.

]]>