Clem7 Brisbane (North South Bypass Tunnel)
MTV was contracted to provide ventilation and dust extraction for the roadheader development of the two-lane 4.8 kilometre tunnels.
- 6 x 250kw Korfmann AL 17-2500
- 9 x 40m3 CFT Dust Collectors
- Flexible Ducting
- Steel Ventilation Ducting
- Semi rigid ducting – polyethylene