Sandfire Resources – De Grussa
1x AL28-5000 415V 500kw Vertical Fan; 1x Twin AL28-5000 415V 500kw
Scope of Works: Electrical Installation Equipment, Mechanical Installation Equipment, Monitoring Equipment and Commissioning & Testing.
Turnkey project involving civils, 11kV/415V Substation, Switch room with VSD drives, PLC, etc, and complete site installation and commissioning. This installation is unique as it has been designed and prepared for two more fans to be fitted in the future, in series with the existing. Substation, Civils and steelwork has been designed for easy change over.